SL

Name of Project

Country

Sector

Client

1. Third Party Management, Supervision and Quality Assurnace of Civil Works under the Third Primary Education Development Program (PEDP-3)-Package PS-213-02-ADB Bangladesh Education/

Engineering

ADB/ DPE
2. Design and Supervision consultancy services for the Bangladesh Agricultural Infrastructure Development Program (BAIDP) under USAID-LGED Bangladesh Local Government/

Agriculture/

Engineering

LGED/ USAID
3. Installation of Pre-paid Gas Meter for Karnaphuli Gas Distribution Company ltd. under Natural Gas Efficiency Project (Loan No. BD-P78) Bangladesh Energy/

Engineering

JICA
4. Strengthen Forest Resource Monitoring and Assessment and Forest Resource Management Information System in Bangladesh Forest Department (Package BFD/S-4) Bangladesh Forestry World Bank
5. Conducting the Verify/Tracer Study (Package No. SD-48) under the STEP of the World Bank Bangladesh TVET World Bank
6. Rehabilitation of Main Line Sections of Bangladesh Railway (West Zone)-Impact Evaluation Bangladesh Railway/

Engineering

IMED/BR
7. Data Validation of Annual Primary School Census-2014” Third Primary Education Development Program (PEDP 3) -Package PS-213-02-ADB Bangladesh Primary Education ADB
8. Construction of Academic Building in 462 Private College in Bangladesh-Impact Evaluation Bangladesh Education/

Engineering

IMED/ GOB
9. Consultancy Services for Pest Risk Analysis (PRA) of Potato in Bangladesh under Strengthening Phytosanitary Capacity Project Bangladesh Agriculture GOB
10. Consultancy Services for Pest Risk Analysis (PRA) of Mango in Bangladesh under Strengthening Phytosanitary Capacity Project Bangladesh Agriculture GOB
11. Aquaculture and Fisheries Management Project in Haor Area-Staff Management Bangladesh Fishery GOB
12. Integrated Community Development Project (ICDP) Chittagong Hill Tracts Area-Phase-2 (3rd Revised)” under the IMED & UNICEF-Impact Evaluation Bangladesh Community Development IMED/ GOB
13. Development of Database for the Student Applied (2014-2015 sessions) for Stipend (Package No. SD-29/2015) under the Skills and Training Enhancement Project (STEP)-IDA Credit # 4764-BD Bangladesh TVET/IT World Bank
14. Verification Survey at the Residences of Students (2014-2015) of different Polytechnic Institutes Applied for Stipend under Skills and Training Enhancement Project of the World Bank in Bangladesh Bangladesh TVET World Bank
15. Hydrological & Morphological Study for the AmuaDhon River Adjoining Area for construct a road bridge over AmuaDhon River under Jhalokhati District Bangladesh Engineering/

Water Management

RHD& GOB
16. Study on the Economic Effects for Investment of Modern or High Speed Railway Bangladesh Railway OEDC
17. Daudkandi to Teknaf Road Maintenance and Improvement Project  (under ADB Assistance)- Impact Evaluation Bangladesh Road/

Engineering

IMED/ RHD
18. Strengthening of Fish Inspection and Quality Control Service in Bangladesh (2nd Revised)-Impact Evaluation Bangladesh Fishery IMED/ EU
19. Baseline Survey of Empowering small & Marginal Famers Improvement Food Security under Food Security Proqramme-Soil Fertility Component in Hilly Areas Bangladesh Food Security/

Agriculture

RDRS/ EU
20. National Agricultural Technology Project (NATP)-DOF Part/WB- Staff Management Bangladesh Agriculture DOF/ WB
21. Bangladesh Marine Fisheries Capacity Building Project-IDB/ DoF- Management Services Bangladesh Fishery DOF/ IDB
22. Rehabilitation and Development of Fisheries Infrastructure to Increase Production Quality Fish Seed and Fingerlings Project of DOF/ MOFL- Management Services Bangladesh Fishery DOF/ GoB
23.

Fish Production, Conservation and Strengthening Management at Kaptai Lake (Component-C: BFRI Part)-Staff Management

Bangladesh Fishery BFRI/ GoB
24.

Freshwater Prawn Culture Extension Project (2nd Phase) of DOF-Staff Management

Bangladesh Fishery DOF/ GoB
25. Study on Fisheries Production and Quality Processing Project Bangladesh Fishery DOF/ GoB
26. Study for Community Based Local Fisheries Management under GEF Bangladesh Fishery DOF/ GEF
27. Study for Protection and Conservation of Juvenile (Jatka) and Gravid Hilsa for Sustainable Development of HilsaFishery in major Rivers Bangladesh Fishery DOF/ DFID
28. Impact evaluation Study of Sustainable Management of Artisanal and Mechanised Commercial Fisheries in the Coastal Areas of Bangladesh Bangladesh Fishery/

Engineering

DOF/ GEF
29. An Impact Study on the Health Safety of Farmers due to Tobacco Production Bangladesh Agriculture/

Health

BATC
30. Impact Evaluation Study for Construction of New Godowns of 1.10 lakh M.T. Capacity in the Northern Region of the Country Bangladesh Agriculture/

Engineering

IMED/ GoB
31. Verification Survey of the Students Studying in Various Diploma Level Polytechnic Institutes (Package No. SD-29-2013) under the Skills and Training Enhancement Project (STEP)-IDA Credit # 4764-BD Bangladesh TVET DTE/ WB
32. Fisherman Registration and Issuing of Identity Card Project (FRICP) funded by the GoB-Staff Management Bangladesh Fishery/IT DOF/ GoB
33. Assessing the e-learning Opportunities in the Secondary Education of Bangladesh of BANBEIS Bangladesh Secondary Education/IT BANBEIS/ GoB
34. Mid Term Review of Empowerment and Livelihood Improvement of the “NutonJibon” Project of SDF/WB Bangladesh Livelihood/

Agriculture/

Engineering

SDF/WB
35. Establishment of 7 Govt. Secondary School in Sylhet, Barisal & Khulna Metropolitan City Project of DSHE-Staff Management Bangladesh Secondary Education/

Engineering

DSHE/ GoB
36. Enhancement of Agricultural Production and Rural Employment through Extension of Agricultural Engineering Technologies of DAE-Impact Study Bangladesh Agriculture/

Engineering

DAE/ IMED
37. Urgent Rehabilitation of Pumping Facilities of G.K. Irrigation Project for Sustaining Rural Economic Development-Impact Study Bangladesh Agriculture/

Engineering/

Irrigation

IMED/ BWDB / ADB
38. Verification Survey of the Students Studying in Various Diploma Level Polytechnic Institutes (Package No. SD-29-2014) under the Skills and Training Enhancement Project (STEP)-IDA Credit # 4764-BD Bangladesh TVET DTE/WB
39. Academic Supervision and Monitoring in Secondary Schools of Bangladesh Bangladesh Secondary Education BANBEIS/ GoB
40. ADB TA-8474 BAN: Natural Gas Transmission and Distribution Development Investment Program-001 Conducting Due Diligence (45203-002) Bangladesh Energy/

Engineering

PB/ ADB
41. Technical Review of Gas Efficiency Improvement Project Bangladesh Energy PB/ GoB
42. Study on Coal gasification Prospects in Bangladesh Bangladesh Energy TEPCO/ JICA
43. Prepare Gas Forecast up to 2030 and Energy Security of Bangladesh Bangladesh Energy JICA
44. Development of Database for the Student Applied for Stipend (Package No. SD-29/2013) under the Skills and Training Enhancement Project (STEP)-IDA Credit # 4764-BD Bangladesh TVET/IT DTE/WB
45. Feasibility study for coal gasification in Bangladesh Bangladesh Energy TEPCO/ JICA
46. Evaluation Study on the Food for Education Project Bangladesh Education/Food Security DSHE/ GoB
47. An Impact Study on Seed Multiplication and Storage Facilities Project at Masterbari, Mymensingh

 

Bangladesh Agriculture ITMC
48. Pest Risk Analysis (PRA) of  Wheat in Bangladesh Bangladesh Agriculture AAER/ DAE
49. Integrated Pest Management of Major Pest of Horticultural Crops Bangladesh Agriculture SAU
50. Tobacco Production and Constraints of Bangladesh-From January 2010 to April 2010, Bangladesh-Impact Study Bangladesh Agriculture JICA
51. Post-harvest management and Its Economic Impact of Bangladesh Bangladesh Agriculture JU
52. Seed Multiplication and Storage Facilities Project at Masterbari, Mymensingh-From August 2007 to May 2009, Bangladesh-Impact Study Bangladesh Agriculture BADC/ GOB
53. Engagement of International Consulting Firm (Service Provider) for “2D Seismic Survey for the Feasibility Study of the Coal Deposit at Dighipara, Dinajpur Bangladesh Energy BAPEX/ PB
54. Forestry Sector Technical Assistance Evaluation Study Bangladesh Forestry NPC/ UNDP
55. Socio-Engineering Study on the Proposed Pharping-Kulekhani Road Project Nepal Road Plan Int’l/ Nepal
56. Rural Water Supply and Sanitation Programme-CAP/HHS including Conflict Management Training to CW/CT for Three Groups of Training Nepal Road RWSSFDB
57. Assessment of Gas Efficiency and System Loss of Titas Gas Transmission and Distribution Company Ltd. Bangladesh Energy JDCF
58. Irrigation and Water Resources Management Project-Environmental Advisor to the project Nepal Water Resources GoNl/WB
59. Environmental Assessment Study for Gongphu- Panbang Highway Road Project Bhutan Road/

Engineering

Government of Bhutan
60. Rural Water Supply and Sanitation Programme-CAP/HHS including Conflict Management Training to CW/CT for Three Groups of Training Nepal Water Resources RWSSFDB
61. Impact Evaluation of Community Infrastructure Works (CIW) of Social Investment Project Program (SIPP) Bangladesh Community Development/

Agriculture

SDF
62. Impact Evaluation Study of the Aquaculture Development Project -IFAD Bangladesh Fishery ADB/ DOF
63. Design and Supervision services for Nagar Shyamolchaya Apartment Bangladesh Engineering Private Fund
64. Design, Construction & Supervision of 600 Flats  for selling to limited income group of people on hire basis/ for residential accommodation to Govt. Employees in Dhaka City-Impact Evaluation Bangladesh Engineering IMED
65. Development of Database for the Students (2013-2014 sessions) Applied for Stipend under the Skills and Training Enhancement Project (STEP)-IDA Credit # 4764-BD Bangladesh TVET/IT DTE/WB
66. Forestry Sector Review Project in Bangladesh-DFID Bangladesh Forestry DFID
67. Project Evaluation and Analysis Study of the Forestry Development Project-USAID-NEP Bangladesh Forestry USAID
68. Forestry Sector Technical Assistance Evaluation Study

 

Bangladesh Forestry UNDP
69. Environmental Impact Assessment (EIA) Training Bangladesh Environment BELTRONIX
70. Environmental Impact Assessment on Production of Tobacco in Bangladesh Bangladesh Environment BATC
71. Pest Risk Analysis (PRA) of Citrus crops of Bangladesh Bangladesh Agriculture ASER
72. Impact Study of Learning Achievement of the Grade Four Completes of Primary Education in Bangladesh Bangladesh Primary Education UNICEF
73. Quantitative Evaluation for Basic for the Hard to Reach Urban Children Project Bangladesh Non Formal Education UNICEF
74. Chittagong Hill Tracts Rural Development Project Bangladesh Rural Development CHTA
75. Mid-term Evaluation of Noakhali  Rural Development Project-II Bangladesh Rural Development DANIDA
76. An Impact Evaluation Study of National Minor Irrigation Development Project (Credit No.2246-BD) – A World Bank Bangladesh Agriculture/

Irrigation

World Bank
77. Impact evaluation Study of Sustainable Management of Artisanal and Mechanized Commercial Fisheries in the Coastal Areas of Bangladesh Bangladesh Fishery GoB
78. Situation Analysis Study for Nutritional Value in Edible Oil Bangladesh Agriculture/Oil SARC
79. Study on Important of Oil Crops Production in Bangladesh and its Nutritional Value Bangladesh Agriculture/Oil SARC
80. Climate Resilient Participatory Afforestation & Reforestation Project under BFD (Package No.: BFD/S4) Bangladesh Forestry World Bank
81. Neemgachi Community Based Aquaculture Project of DoF-Staff Management Bangladesh Fishery GoB
82. Study on Present Status and Prospects of use of Web Portal in Secondary and Higher Education Bangladesh Secondary Education/IT GoB
83. Conducting Baseline Survey of Promoting Agricultural Commercialization and Enterprises (PACE) Project of PKSF” Bangladesh Agriculture PKSF/ IFAD
84. Consultancy Services for Pest Risk Analysis (PRA) of Cucurbits in Bangladesh under Strengthening Phytosanitary Capacity Project Bangladesh Agriculture GOB
85. Consultancy Services for Pest Risk Analysis (PRA) of Cut Flower and Foliage in Bangladesh under Strengthening Phytosanitary Capacity Project Bangladesh Agriculture GOB
86. Consultancy Services for  RPL (Recognition of Prior Learning) Assessment under STEP Bangladesh TVET World Bank
87. Consulting Services for Institutional Performance Audit Firm (Package No. SD-33) under Skills and Training Enhancement Project (STEP) Bangladesh TVET World Bank
88. Consultancy Services for Floriculture Study Relevant Areas in Country under Second Crop Diversification Project (SCDP) Bangladesh Agriculture ADB
89. Consultancy Services for Study on Women Empowerment and Gender Equality in the Project Areas under Second Crop Diversification Project (SCDP) Bangladesh Agriculture ADB
90. Consultancy Services for 3rd Party Validation of Data Collection and Monitoring Activities of IAPP Bangladesh Agriculture World Bank
91. Consultancy Services for Institutionalizing Result Based Management (RBM) Approach in Primary Education (Contract No. PS 401) Bangladesh Primary Education ABD
92. Consultancy Services for A Study on Exploring Alternative Method & Modalities of Providing DPEd to all Primary Teachers under PEDP-3 (Contract No. PS 515) Bangladesh Primary Education ABD
93. A Feasibility Study on Introducing DPEd as Pre-Serving Training (Phase-2); Contract No. PS 515 Bangladesh Primary Education ADB
94. Expansion of Aquaculture Technology Services up to Union Level Project (Phase II) of DoF- Management Service Bangladesh Fishery GOB
95. Establishment of Beel Nursery and Fingerlings Stocking in Inland Open Water Project of DoF Bangladesh Fishery GOB
96. Feasibility Study for Central Power Plant & Energy Efficient Lighting (EE) in the Konabari Cluster, Gazipur Bangladesh Power IFC
97. Development of Database for the Students (2015-2016 sessions) Applied for Stipend under the Skills and Training Enhancement Project (STEP)-IDA Credit # 4764-BD Bangladesh TVET/IT DTE/WB
98. Verification of Periodical Evaluation of New Enrollment (Phase-I) under Skills and Training Enhancement Project (STEP) –Package No. SD-53.1 Bangladesh TVET DTE/WB
99. Conducting study on private and public expenditure in secondary school under BANBEIS Bangladesh Secondary Education GOB
100. Conducting a Study on Capacity Assessment of Monitoring and Evaluation Division of the Directorate of Primary Education (Contract No. PS 516) under Third Primary Education Development Program (PEDP-3) Bangladesh Primary Education ADB
101. Conducting Third Party Validation (TPV) of Annual School Census (APSC)-2016 under Third Primary Education Development Program (PEDP-3)-RFP No.: PS 517) Bangladesh Primary Education ADB
102. Climate Resilient Ecosystems and Livelihood Project-Staff Management Bangladesh Environment GOB
103. Consultancy Services for: Training on Safety Net Program Operations & Public Information Campaign -Service Package # SF-3 under Safety Net Systems for the Poorest (SNSP) Project (Credit No.:-5281-BD & Project ID: P132634)-Ministry of Disaster Management & Relief Bangladesh Disaster Management/

Training/Safety Net

World Bank
104. Consultancy services for Conducting In-depth Monitoring of Rural Livelihood Project (RLP)-2nd Phases Bangladesh Rural Livelihood GOB
105. Consultancy services for conducting impact evaluation study of the Bangladesh Agribusiness Development Project (BADP) -1st Revised Bangladesh Agriculture GOB
106. Consultancy services for Impact Evaluation Study of the Re-development of Bakhrabad Gas Field -Phase-1 Bangladesh Energy GOB
107. Feasibility Study for Jet A-1 Pipeline from Main Installation, Padma Oil Co. Ltd. to SahaAmanat International Airport, Chittagong Bangladesh Oil/Energy/

Engineering

GOB
108. Support for FMO Bangladesh Methodology development & Baseline (Re) Construction NORC Project Bangladesh Port Engineering Netherland
109. Conducting a Study to assess the use of ICT equipment to date, Indentify further needs for effective use and cost effectiveness (Contract No. PS 519) under Third Primary Education Development Program (PEDP 3) Bangladesh Primary Education/ICT ADB
110. Consultancy services for Valuation of Assets & Liabilities of Chittagong Water Supply and Sewerage Authority (CWASA) [Contract Package No.: CWSISP/S-32] Bangladesh Audit World Bank
111. Training Management Consulting Services for Managing the Implementation of International Training Courses for SGCL Personnel under Southwest Region Gas Distribution Network Project. Bangladesh Energy/Training ADB
112. Feasibility Study of the Construction of the Summit Alliance Port  Ltd. (SAPL) River Transport Facility in Naraynganj, Bangladesh Bangladesh Port Engineering FMO
113. Support for FMO Bangladesh Methodology Development and Baseline for (Re) Construction of Summit Alliance Port Ltd. (SAPL) River Port Facility in Narayganj, Bangladesh Bangladesh Port Engineering FMO
114. Feasibility Study for Installation of Pre-Paid Gas Meter for KGDCL under Natural Gas Efficiency Project. (Loan No. BD P78)-JICA Bangladesh Energy/

Engineering

JICA
115. Feasibility Study for Jet A-1 Pipeline from Main Installation, Guptakhal, Patenga, to Shah Amanat International Airport Chittagong Bangladesh Oil Pipeline Engieering GOB
116. Development and Preparation of Pre-Bid, Bid Document for Recruitment of International OEM for Supply and Installation of Pre-Paid Gas Meter for KGDCL under Natural Gas Efficiency Project. (Loan No. BD P78)-JICA Bangladesh Energy/

Engineering

JICA
117. Consulting services for Training, Assessment and Certification though Recognition of Prior Learning (RPL)  under Package No: SD-12 of Skills for Employment Investment Program (SEIP) Bangladesh TVET/Training ADB